[1]
Ryabchun, Y. 2019. Analysis of planning and construction solutions of apparatus objects, as factor of influence on the method of determination of their construction periods. Ways to Improve Construction Efficiency. 2, 39 (Feb. 2019), 145–150. DOI:https://doi.org/10.32347/2707-501x.2019.39.145-150.