[1]
Vakhovych, L.V. and Kozenko, V.S. 2018. Consolidated indicators of cost of laying water supply network. Ways to Improve Construction Efficiency. 38 (Nov. 2018), 118–124. DOI:https://doi.org/10.32347/2707-501x.2018.38.118-124.