[1]
Vasylieva, N. , Bolila, N. and Tsyfra, T. 2022. Forecasting the level of rehabilitation capacity of the construction company. Ways to Improve Construction Efficiency. 1, 49 (Apr. 2022), 157–163. DOI:https://doi.org/10.32347/2707-501x.2022.49(1).157-163.