[1]
Makhynia, O. and Halenko, Y. 2023. The use of pile columns during the building construction by the top-down method. Ways to Improve Construction Efficiency. 1, 51 (Jun. 2023), 259–270. DOI:https://doi.org/10.32347/2707-501x.2023.51(1).259-270.