[1]
TYTOK, V. and SYVOLAP, Y. 2025. Substitution of the significance of the choice of a design solution and its impact on the total cost of the life cycle of a construction object. Ways to Improve Construction Efficiency. 1, 55 (Mar. 2025), 273–284. DOI:https://doi.org/10.32347/2707-501x.2025.55(1).273-284.