[1]
Sichnyi, .S. 2020. Reduction of error in determining the cost of construction resources in estimated documentation. Ways to Improve Construction Efficiency. 46 (Oct. 2020), 144–154. DOI:https://doi.org/10.32347/2707-501x.2020.46.144-154.