Ryabchun, Y. (2019). Analysis of planning and construction solutions of apparatus objects, as factor of influence on the method of determination of their construction periods. Ways to Improve Construction Efficiency, 2(39), 145–150. https://doi.org/10.32347/2707-501x.2019.39.145-150