Tugai, O. ., Ivaneiko, I. ., Dubynka, O. ., Shebek М. ., Ivaneiko, M. ., & Oilynyk, V. . (2023). The influence of the period of collection of flows in industrial construction without using additional labor resources. Ways to Improve Construction Efficiency, 1(52), 171–180. https://doi.org/10.32347/2707-501x.2023.52(1).171-180