Purs, G. A., & Mikhalkevich, N. M. (2019). Development of methodological and organizational approach to determine the cost of construction through the use of variant design. Ways to Improve Construction Efficiency, (42), 153–169. https://doi.org/10.32347/2707-501x.2019.42.153-169