Ryabchun, Ya. 2019. “Analysis of Planning and Construction Solutions of Apparatus Objects, As Factor of Influence on the Method of Determination of Their Construction Periods”. Ways to Improve Construction Efficiency 2 (39):145-50. https://doi.org/10.32347/2707-501x.2019.39.145-150.