Tugai, O. ., Ivaneiko, I. ., Dubynka, O. ., Shebek М. ., Ivaneiko, M. . and Oilynyk, V. . (2023) “The influence of the period of collection of flows in industrial construction without using additional labor resources”, Ways to Improve Construction Efficiency, 1(52), pp. 171–180. doi: 10.32347/2707-501x.2023.52(1).171-180.