[1]
Blonnyi, A. 2024. Optimization of construction under crisis conditions and subsequent recovery: adaptive models for critical infrastructure. Ways to Improve Construction Efficiency. 2, 54 (Nov. 2024), 200–213. DOI:https://doi.org/10.32347/2707-501x.2024.54(2).200-213.