Blonnyi, A. (2024) “Optimization of construction under crisis conditions and subsequent recovery: adaptive models for critical infrastructure”, Ways to Improve Construction Efficiency, 2(54), pp. 200–213. doi: 10.32347/2707-501x.2024.54(2).200-213.