OLIINYK, V. . “Formation of a Structural Model for Determining the Duration of Construction in the Conditions of an Energy Crisis”. Ways to Improve Construction Efficiency, vol. 2, no. 57, Feb. 2026, pp. 202-8, doi:10.32347/2707-501x.2026.57(2).202-208.