Modeling of construction work combination during reconstruction

Authors

  • Ye. Romanushko Kyiv National University of Construction and Architecture, Ukraine https://orcid.org/0000-0003-2708-3929
  • V. Romanushko Kyiv National University of Construction and Architecture, Ukraine

DOI:

https://doi.org/10.32347/2707-501x.2019.39.164-169

Keywords:

modeling, building reconstruction, process combination, work area, schedule.

Abstract

The article deals with the modeling of combining construction works during reconstruction of buildings with the use of interchangeable work areas. The schedule for work combination with the representation of the placement of work areas within the object space and its timing is proposed.  This allows to enhance the safety and efficiency of construction and installation works; decrease the time frame; and reduce the cost of reconstruction.

References

Осипов А. Ф. Исследование и параметризация условий производства работ при реконструкции зданий и сооружений [Текст] / А. Ф. Осипов // Современное промышленное и гражданское строительство. - 2014. - Том 10, №1, С. 33-40.

Технологія монтажу будівельних конструкцій : Навчальний посібник. /В. К.Черненко, О.Ф.Осипов, Г.М. Тонкачеєв та інші; За ред. В.К. Черненка. Київ, 2011. -372 с.

Романушко В. Є. скорочення термінів будівельних робіт при реконструкції. Управління розвитком складних систем. – 2017. 30. ст.187-192

How to Cite

Romanushko, Y., & Romanushko, V. (2019). Modeling of construction work combination during reconstruction. Ways to Improve Construction Efficiency, 2(39), 164–169. https://doi.org/10.32347/2707-501x.2019.39.164-169