Criteria for systematic assessment of organizational and technological solutions for construction work during reconstruction

Authors

DOI:

https://doi.org/10.32347/2707-501x.2020.43.134-143

Keywords:

modeling, reconstruction of buildings, organizational and technological solutions, balanceness of production systems, systemic evaluation criteria, ranking

Abstract

Reconstruction of buildings is characterized by more complex conditions for carrying out construction works, which result in the decrease of construction works performance, and increase of their cost in comparison to a new construction. A considerable number of specific conditions for reconstruction, dynamics of their change when carrying out works, increase of mutual influence of participants’ actions, performance of works in confined spaces and terms, require improvement of their technological preparation based on the approaches and methods which will allow to ensure rational execution of works for all participants of the reconstruction process.

It is proposed to improve the technological preparation for reconstruction works on the basis of systematic methods which allow to ensure the rational execution of works for all participants of the reconstruction process. The influence of interaction with other participants in the construction process, as well as the degree of their adaptability to specific conditions of reconstruction are taken into account. Ensuring the account of specific factors of reconstruction and obtaining optimal organizational and technological solutions balanced for all participants in the execution of construction works is performed by creating a system model for the execution of construction works. It is proposed to represent the construction production system as a set of interacting subsystems, one of which is the subsystem of technological preparation of construction works.

The article provides systematic basic concepts for modeling of building production systems. The criteria for systematic assessment of organizational and technological solutions of construction works in specific unstable conditions of reconstruction are proposed. The proposed criteria for assessing the state of systemic balanceness may be used as integrated indicators for ranking, comparison and selection of individual solutions for technological preparation of construction works. Checking the status of specific conditions analysis within the technological preparation of construction works for enterprises reconstruction identifies the reserves of construction works effectiveness during reconstruction. The need to account for the permanent or long-term factors primarily during the technological preparation of construction works is confirmed

References

Belyakov Yu.I., Snezhko A.P. (1988). Rekonstruktsiya promyshlennykh predpriyatiy [Reconstruction of industrial enterprises]. Kyiv, Ukraine: Vyshcha Shkola – 225.

Zaitsev I.A., Storchak V.A., Levitsky S,A., Denisenko N.P. (1987). Organizatsyonno-ekonomicheskiye problemy stroitelstva pri rekonstruktsii i tekhnicheskom perevooruzhenii predpriyatiy [Organizational and economic problems of construction during the reconstruction and technical re-equipment of enterprises]. Kyiv, Ukraine: UKRNIINTI, 32.

Shahin A.L., Bondarenko Yu.V., Honcharenko D.F., Goncharov V.B. (1991). Rekonstruktsiya zdaniy i sooruzheniy [Reconstruction of buildings and constructions]. Manuel for students of construction specialities under the editorship of Shahin A.L. Moscow, Russia: Vysshaya Shkola – 352.

Bolshakov V.A. (1985). Obosnovaniye tekhniko-ekonomicheskikh i kachestvennykh kriteriyev otsenki organizatsii rekonstruktsii [Justification of technical, economic, and qualitative criteria for assessing the reconstruction organization]. Moscow, Russia: Promyshlennoye Stroitelstvo journal (8), 14– 16.

Kirnos V.M. (1994). Nauchno-metodologicheskiye osnovy organizatsionno-tekhnologicheskogo regulirovaniya prodolzhitel'nosti i stoimosti rekonstruktsii promyshlennykh predpriyatiy [Scientific and methodological guidance for organisational and technological regulation of the duration and cost of the reconstruction of industrial enterprises]. Dnepropetrovsk, Ukraine: Thesis for Doctor’s degree.

Belyakov Yu.I. & Fedosenko N.M. (1991) Rekonstruktsiya promyshlennykh predpriyatiy (rekomendatsii po proizvodstvu trudoyemkikh stroitelnykh protsessov) [Reconstruction of industrial enterprises (recommendations on labor-intensive construction processes)]. Kyiv, Ukraine: Minpromstroy of Ukrainian SSR, the USSR Ministry of Higher Education – 83.

Osipov A.F. (2014) Issledovaniye i parametrizatsiya usloviy proizvodstva rabot pri rekonstruktsii zdaniy i sooruzheniy [Research and parameterization of conditions for performing works during the reconstruction of buildings and structures] [Text]. Modern industrial and civil construction – vol.10 (1), 33 – 40.

Balitskiy V.S., Damaskin B.S., Tretyak T.P. & et. al. (1984). Podgotovka stroitelnogo proizvodstva pri rekonstruktsii predpriyatiy [Preparation of construction operations under the enterprise reconstruction]. UkrSSR Stroitelnoye proizvodstvo, (23), 31 – 35.

Romanushko V. Ye. Skorochennia terminiv budivelnykh robit pry rekonstruktsii. Upravlinnia rozvytkom skladnykh system, 2017, 30,st.187-192

Romanushko Ye. H. Modeliuvannia budivelno-montazhnykh protsesiv pry tekhnolohichnii pidhotovtsi./ Teoriia i praktyka budivnytstva”, “Lvivska poli-tekhnika”, 1998, №360 – s.202-207vo - 2014. - Tom 10, №1, S. 33-40.

Romanushko Ye. H. Otsinka tekhnolohichnykh rishen budivelno-montazhnykh robit pry rekonstruktsii pidpryiemstv / Stroytelstvo y tekhnohennaia bez-opasnost, vыp. 6. Symferopol, KAPKS, 2002,-s.302-304

How to Cite

Romanushko, Y., & Romanushko, V. (2020). Criteria for systematic assessment of organizational and technological solutions for construction work during reconstruction. Ways to Improve Construction Efficiency, (43), 134–143. https://doi.org/10.32347/2707-501x.2020.43.134-143