Variable strategies for designing management structures in development construction projects

Authors

Keywords:

development, construction project, management structure, management strategy, organizational model, digital transformation, risks

Abstract

This work is devoted to the study of variable strategies for designing management structures in development construction projects. In the conditions of dynamic development of the construction industry and increasing complexity of development projects, there is a need to adapt management models to changing market conditions, regulatory requirements and technological challenges. The effectiveness of the management structure directly affects the implementation time, budgeting, quality of work performed and the overall competitiveness of the development project.

The main concepts of forming organizational structures for managing construction development projects are considered. Three key approaches are distinguished: hierarchical, matrix and hybrid. The hierarchical model is characterized by centralized decision-making, which promotes control, but limits flexibility. The matrix approach involves the distribution of responsibility between functional units, which increases coordination, but can lead to conflicts between management levels. The hybrid approach combines the advantages of both models, providing an optimal balance between control and adaptability.

The article analyzes the factors influencing the choice of a particular management structure, in particular the scale of the project, the level of technological complexity, the availability of financial resources, regional features, as well as the strategic goals of the developer. A comparative analysis of the effectiveness of the application of different approaches in the context of ensuring optimal resource allocation, minimizing risks and increasing productivity is carried out.

Special attention is paid to modern trends in the digital transformation of management structures in construction projects. The impact of automated management systems, BIM technologies (Building Information Modeling) and artificial intelligence on the optimization of project processes, increasing forecasting accuracy and improving communication between project participants is studied.

The practical significance of the study lies in the development of recommendations for the selection and adaptation of the optimal management structure in accordance with the specifics of a particular development project. The proposed approaches can be used to improve the efficiency of planning, coordination and implementation of construction projects in modern conditions.

References

Basak D., Haider T., Shrivastava A.K. Lean Manufacturing in Practice A Case Study of Toyota Motors Company. International Journal of Computer Science & Management Studies. 2013. Vol. 13 Issue 5. P. 18-20. URL: http://www.ijcsms.com/journals/Volume%2013,%20Issue%2005,%20July%202013_4.pdf

Honcharenko T., Chupryna Yu., Ivakhnenko I., Zinchenko M., Tsyfra T. Reengineering of the Construction Companies Based on BIM- technology. International Journal of Emerging Trends in Engineering Research. 2020. Volume 8. No. 8, pp. 4166-4172. https:// doi.org/ 10.30534/ijeter/2020/22882020

Chernyshev D., Ryzhakov D., Dikiy O., Khomenko O., Petrukha S. Innovative Technology for Management Tools of Commercial Real Estate in Construction. International Journal of Emerging Trends in Engineering Research. 2020. Volume 8. No. 9, pp. 4967-4973. https://doi.org/10.30534/ije

Shpakova H., Chupryna Iu., Ivakhnenko I., Biloshchytskyi A., Zinchenko M., Plys N. Tools For Assessing The Competitiveness Of A Construction Company As A Contractor In Public-Private Partnership Projects. 2024 IEEE 4th International Conference on Smart Information Systems and Technologies (SIST). DOI: 10.1109/SIST61555.2024.10629561

Marnet O. Behaviour and Rationality in Corporate Governance (Routledge Series in Corporate Governance). London and New York: Routledge, 2008. 303 p.

Mottaghian K. The Influences of Internet on the Organizational Buying Behavior of Professional Services: Master's Thesis: 11.05.04. Lulea University of Technology. IES 971 87 Lulea, 2004. P. 97.

Lataniuk N., Pokolenko V., Bondar O., Yaschenko O., Yakymchuk I. Development of construction projects as a compond aggregated system. Ad Alta, 2023. № 13, рр. 31-39

Organization Project Management Maturity Model (OPM3). Newtown Square, Pennsylvania, USA: Project Management Institute, 2003. 195 p.

Akselrod R., Shpakov A., Ryzhakova G., Honcharenko T., Chupryna Iu., Shpakova Н. Integration of Data Flows of the Construction Project Life Cycle to Create a Digital Enterprise Based on Building Information Modeling. International Journal of Emerging Technology and Advanced Engineering, 2022, Volume 12, Issue 01. DOI: 10.46338/ijetae0122_05

Шпаков А.В. Методологічні підходи формування інноваційних технологій управління підприємствами в динамічному бізнес-середовищі будівельного девелопменту. Управління розвитком складних систем. 2022. Вип. 49. С. 124-131. DOI: https://doi.org/10.32347/2412-9933.2022.49.124-131

Азарова І.Б. Ціннісно-орієнтований підхід в управлінні інвестиційнобудівельними проектами житлового будівництва: дис. … кан. тех. наук: 05.13.22. ХНУМГ ім. Бекетова, Харків, 2016. 145 с.

Ваколюк А.С. Мінімізація ризиків реалізації проектів з комплексної термомодернізації. Будівельне виробництво. 2014. № 57. С. 30-32.

Цалко Т.Р., Невмержицька С.М. Система ключових показників ефективності як запорука ефективного управління бізнес-процесами в компанії. Проблеми системного підходу в економіці. 2019. Вип. 6 (74), Ч. 2. С. 160-167. DOI: 10.32782/2520-2200/2019-6-46

Петренко І.В. Математичне моделювання ефективності управління: залежність тривалості реалізації проєкту від кількості управлінських рівнів: монографія. Київ: Видавництво КНЕУ, 2022. С. 190-198. URL: https://ir.kneu.edu.ua/handle/2010/41625.

Приходько Д.О., Ніколаєв Г.В., Козаченко А.Г. Оновлення методологічної платформи упорядкування проектів до складу портфеля девелоперської компанії. Актуальні проблеми управління соціально-економічними системами: матеріали VІ Міжнар. наук.-практ. інтернет-конф., Луцьк, 11 груд. 2020 р., Луцьк: ІВВ Луцького НТУ, 2020. С. 83-84

Саричев Д.О. Управління ефективністю операційної діяльності підприємства. Стратегія економічного розвитку України. 2012. № 30. URL: https://ir.kneu.edu.ua/bitstream/handle/2010/4347/2012_30_%28136-143%29.pdf?sequence=1&isAllowed=y 2020

Рижакова Г.М., Шпаков А.В., Чуприна Ю.А. та ін. Система конфігурація менеджменту будівництва: модернізація методико-аналітичних інструментів: монографія. К.: Вид-во ДНДІ інформатизації та економіки, 2020. 514 с.

Published

2025-03-28

How to Cite

POKOLENKO, V. ., SHCHERBAN, B. ., TSYMBALISTY, Y. ., & HERASYMCHUK, Y. . (2025). Variable strategies for designing management structures in development construction projects. Ways to Improve Construction Efficiency, 1(55), 167–182. Retrieved from http://ways.knuba.edu.ua/article/view/326943