Variable strategies for designing management structures in development construction projects
Keywords:
development, construction project, management structure, management strategy, organizational model, digital transformation, risksAbstract
This work is devoted to the study of variable strategies for designing management structures in development construction projects. In the conditions of dynamic development of the construction industry and increasing complexity of development projects, there is a need to adapt management models to changing market conditions, regulatory requirements and technological challenges. The effectiveness of the management structure directly affects the implementation time, budgeting, quality of work performed and the overall competitiveness of the development project.
The main concepts of forming organizational structures for managing construction development projects are considered. Three key approaches are distinguished: hierarchical, matrix and hybrid. The hierarchical model is characterized by centralized decision-making, which promotes control, but limits flexibility. The matrix approach involves the distribution of responsibility between functional units, which increases coordination, but can lead to conflicts between management levels. The hybrid approach combines the advantages of both models, providing an optimal balance between control and adaptability.
The article analyzes the factors influencing the choice of a particular management structure, in particular the scale of the project, the level of technological complexity, the availability of financial resources, regional features, as well as the strategic goals of the developer. A comparative analysis of the effectiveness of the application of different approaches in the context of ensuring optimal resource allocation, minimizing risks and increasing productivity is carried out.
Special attention is paid to modern trends in the digital transformation of management structures in construction projects. The impact of automated management systems, BIM technologies (Building Information Modeling) and artificial intelligence on the optimization of project processes, increasing forecasting accuracy and improving communication between project participants is studied.
The practical significance of the study lies in the development of recommendations for the selection and adaptation of the optimal management structure in accordance with the specifics of a particular development project. The proposed approaches can be used to improve the efficiency of planning, coordination and implementation of construction projects in modern conditions.
References
Basak D., Haider T., Shrivastava A.K. Lean Manufacturing in Practice A Case Study of Toyota Motors Company. International Journal of Computer Science & Management Studies. 2013. Vol. 13 Issue 5. P. 18-20. URL: http://www.ijcsms.com/journals/Volume%2013,%20Issue%2005,%20July%202013_4.pdf
Honcharenko T., Chupryna Yu., Ivakhnenko I., Zinchenko M., Tsyfra T. Reengineering of the Construction Companies Based on BIM- technology. International Journal of Emerging Trends in Engineering Research. 2020. Volume 8. No. 8, pp. 4166-4172. https:// doi.org/ 10.30534/ijeter/2020/22882020
Chernyshev D., Ryzhakov D., Dikiy O., Khomenko O., Petrukha S. Innovative Technology for Management Tools of Commercial Real Estate in Construction. International Journal of Emerging Trends in Engineering Research. 2020. Volume 8. No. 9, pp. 4967-4973. https://doi.org/10.30534/ije
Shpakova H., Chupryna Iu., Ivakhnenko I., Biloshchytskyi A., Zinchenko M., Plys N. Tools For Assessing The Competitiveness Of A Construction Company As A Contractor In Public-Private Partnership Projects. 2024 IEEE 4th International Conference on Smart Information Systems and Technologies (SIST). DOI: 10.1109/SIST61555.2024.10629561
Marnet O. Behaviour and Rationality in Corporate Governance (Routledge Series in Corporate Governance). London and New York: Routledge, 2008. 303 p.
Mottaghian K. The Influences of Internet on the Organizational Buying Behavior of Professional Services: Master's Thesis: 11.05.04. Lulea University of Technology. IES 971 87 Lulea, 2004. P. 97.
Lataniuk N., Pokolenko V., Bondar O., Yaschenko O., Yakymchuk I. Development of construction projects as a compond aggregated system. Ad Alta, 2023. № 13, рр. 31-39
Organization Project Management Maturity Model (OPM3). Newtown Square, Pennsylvania, USA: Project Management Institute, 2003. 195 p.
Akselrod R., Shpakov A., Ryzhakova G., Honcharenko T., Chupryna Iu., Shpakova Н. Integration of Data Flows of the Construction Project Life Cycle to Create a Digital Enterprise Based on Building Information Modeling. International Journal of Emerging Technology and Advanced Engineering, 2022, Volume 12, Issue 01. DOI: 10.46338/ijetae0122_05
Шпаков А.В. Методологічні підходи формування інноваційних технологій управління підприємствами в динамічному бізнес-середовищі будівельного девелопменту. Управління розвитком складних систем. 2022. Вип. 49. С. 124-131. DOI: https://doi.org/10.32347/2412-9933.2022.49.124-131
Азарова І.Б. Ціннісно-орієнтований підхід в управлінні інвестиційнобудівельними проектами житлового будівництва: дис. … кан. тех. наук: 05.13.22. ХНУМГ ім. Бекетова, Харків, 2016. 145 с.
Ваколюк А.С. Мінімізація ризиків реалізації проектів з комплексної термомодернізації. Будівельне виробництво. 2014. № 57. С. 30-32.
Цалко Т.Р., Невмержицька С.М. Система ключових показників ефективності як запорука ефективного управління бізнес-процесами в компанії. Проблеми системного підходу в економіці. 2019. Вип. 6 (74), Ч. 2. С. 160-167. DOI: 10.32782/2520-2200/2019-6-46
Петренко І.В. Математичне моделювання ефективності управління: залежність тривалості реалізації проєкту від кількості управлінських рівнів: монографія. Київ: Видавництво КНЕУ, 2022. С. 190-198. URL: https://ir.kneu.edu.ua/handle/2010/41625.
Приходько Д.О., Ніколаєв Г.В., Козаченко А.Г. Оновлення методологічної платформи упорядкування проектів до складу портфеля девелоперської компанії. Актуальні проблеми управління соціально-економічними системами: матеріали VІ Міжнар. наук.-практ. інтернет-конф., Луцьк, 11 груд. 2020 р., Луцьк: ІВВ Луцького НТУ, 2020. С. 83-84
Саричев Д.О. Управління ефективністю операційної діяльності підприємства. Стратегія економічного розвитку України. 2012. № 30. URL: https://ir.kneu.edu.ua/bitstream/handle/2010/4347/2012_30_%28136-143%29.pdf?sequence=1&isAllowed=y 2020
Рижакова Г.М., Шпаков А.В., Чуприна Ю.А. та ін. Система конфігурація менеджменту будівництва: модернізація методико-аналітичних інструментів: монографія. К.: Вид-во ДНДІ інформатизації та економіки, 2020. 514 с.
Downloads
Published
How to Cite
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).