Features of designing and arrangement of facades in the conditions of dense historical building and tightness
DOI:
https://doi.org/10.32347/2707-501x.2020.43.155-165Keywords:
reconstruction, compacted conditions, historical building, organization of construction, design, medical center, facade system, insulationAbstract
The article deals with the problems and requirements that arise when performing facade works during reconstruction in conditions of dense historical development. The necessary methods and approaches to the reconstruction of the old fund buildings and in particular to the facade arrangement have been determined. The real example of reconstruction of a non-residential building under a medical center is considered, the conditions that complicate the work are determined, the main ones are the constrained conditions, the restricted territory for the deployment of works fronts and the location around residential buildings. The authors identify the aspects that influence the decision making for the facade system. The architectural aspect and its influence on the choice of the facade system are considered. The construction aspect, which is directly related to the use of certain facade systems and the requirements for the assembly of the system of structures with facade thermal insulation, is defined. The technological aspect related to the characteristics of materials that were to be used (including effective thermal insulation materials) by equipment and organization of work execution is considered. In accordance with the previously defined aspects, the authors substantiate the choice of a "wet-type" Tex-Color external thermal insulation system with mineral wool insulation. The main features and difficulties that arose during the design and execution of works, namely the presence of different wall thickness; enlargement of window and door openings; heterogeneity of materials of load-bearing walls: concrete, brick, foam concrete, metal; arrangement of modern ventilation and air-conditioning system; replacement of existing engineering networks; arrangement of fire-alarm and fire-extinguishing systems; arrangement of decorative facade elements; arrangement of guardrails of balconies, railings and stairs. To summarize, the authors pay particular attention to the need to take into account such factors as the relatively short repair life, low maintenance, differences in the life of plaster and paint in the execution and choice of plastering facade insulation systemsReferences
Designs of external walls with facade thermal insulation and plastering. General specifications: DSTU B V.2.6-36: 2008. (2008). [in Ukrainian].
Evstratenko S. (2007) Principles of Allowable Transformations of Facades of Historic Buildings of Major Cities. Rostov-on-Don, Russia. [in Russian].
Exterior wall designs with front thermal insulation. Design requirements, DBN V.2.6-33: 2018. (2018). [in Ukrainian].
Goryachev, O. (2004). Organizational and technological preparation of construction of multi-storey buildings in limited conditions. Moscow, Russia. [in Russian].
Livinsky, O. (2010). L55 Finishing works: Materials, technology and organization of works, means of mechanization. Kyiv, Ukraine [in Ukrainian].
Sedov, D. (2018). Restrictive factors in dense urban development. Retrieved from https://cyberleninka.ru/article/n/faktory-stesnennosti-v-usloviyah- plotnoy-gorodskoy-zastroyki-1 [in Russian].
Downloads
How to Cite
Issue
Section
License
Copyright (c) 2020 О. Chertkov, R. Musiyets, V. Tsehelnyi

This work is licensed under a Creative Commons Attribution 4.0 International License.
The collected scientific papers “Ways to Improve Construction Efficiency” adheres to a policy of immediate open access to published materials, supporting the principles of open science, free dissemination of scientific information, and international exchange of knowledge in the field of construction and engineering.
All scientific articles of the collection are published in open access and are freely available to readers without registration, subscription, or any other charges. Access to the full texts of the materials does not require payment.
The materials are distributed under the terms of the international license of Creative Commons - Creative Commons Attribution 4.0 International (CC BY 4.0), which permits unrestricted copying, distribution, reproduction, adaptation, and use of the materials for any purposes, including commercial ones, provided that proper attribution is given to the author(s), a reference to the collection “Ways to Improve Construction Efficiency” as the source of publication is provided, and any changes made are indicated.
Authors retain copyright to their publications and grant the collection the right of first publication.